Overview
This article covers replacing a faulty GPO unit (power point) in a FUYL Locker (MK1).
Tools Required
- (Battery operated) Screwdriver
- Security Torx-Head Screwdriver bit
- Phillips-Head Screwdriver bit
- Cable Cutters
- 10 – 15 cable ties
Process
Get access
- Power down the locker Unplug it and wait 30 seconds for any power to dissipate.
- Remove the side panel Undo the 20–25 Torx screws on the side and front panels. This is what you’ll see with the side panel removed.
- Cut the cable ties Cut the cable ties holding the power point cable and the USB port label, so the process goes smoothly.
Remove the faulty power point
- Unscrew the power point From inside the locker. There’s a second screw that’s hard to see.
- Move the power point out of the way It’s best to move the cable from the power point above as positioned below. This can be quite tough, but it’s easier with the cable ties removed.
- Slide out the power point Pop the left-hand side of the power point out of the socket, and slide the whole unit out.
- Cut the remaining cable ties Cut the ties holding the power point cables in place.
- Follow the power cable Follow it down through the cable routing cut-outs and into the power board in the bottom cabinet.
- Remove the faulty power point Unplug it and remove it from the locker.
Fit the new power point
- Screw in the new power point Insert it and screw it into the locker.
- Route the cable Roughly route it alongside the other power cables, threading the IEC connector through the cable routing holes at the bottom of the locker.
- Plug in the IEC connector Into the spot left vacant by the faulty power point.
- Cable tie the power cables Cable tie them wherever a new power point is connected.
- Refit the side panel Using the security Torx screws.
- Firstly, start by inserting and screwing in the new power point into your locker
- Next you can roughly route the cable alongside the other power cables, threading the IEC connector through the cable routing holes at the bottom of the locker
- Plug in the IEC connector into the vacant spot created when we removed the faulty power point
- At this point we begin cable tying the power cables, we cable tie when every new power point is connected
- Once this is complete we are done with the internals, using the security torx screws, fit the side panel back onto the locker.
You are now complete and have replaced a faulty power point.