Overview
This article covers replacing the data cable in a FUYL Locker (MK2).
Procedure
Get access
- Power down the locker Unplug it and wait 30 seconds for any power to dissipate.
- Open the side panel
- Open the Control Door Compartment Wear an anti-static strap, as the control door is easily damaged by electrostatic discharge.
Remove the old cable
- Undo the Velcro ties Undo the two Velcro ties that retain the Data Cable.
- Unplug the Data Cable
- Remove the Ferrite Remove the Ferrite from the Data Cable.
- Disconnect the lock modules Disconnect the Data Cable from all lock modules.
- Remove the cable Pull the Data Cable out through the Grommet in the Side Compartment.
Fit the new cable
- Connect the lock modules Connect header 2 to the Lock Module in compartment 1, then connect lock modules 2–5/15 in order. Use the correct end of the cable, as it has the right allowance for the control door at header 1.
- Pass header 1 through the grommet
- Position the Ferrite Fully open the Control Door and measure the Data Cable against it. Slightly relax the cable toward the Control Door’s hinge, then place the Ferrite where the cable crosses the black Velcro Tie.
- Loop the cable around the Ferrite Make two loops and clip it closed. There should be four bands of cable on the outside of the Ferrite.
- Secure and connect Do up the Velcro Ties so the black one takes the Ferrite’s weight. Connect the Data Cable to the Control Door, with enough slack between the Ferrite and the PCB. Check the notes below.
- Check the Control Door Make sure cable routing in the Control Door Compartment is neat and secure, and that the door opens and closes easily, locks securely and doesn’t foul or chafe on the cables.
- Check the Maintenance Access Panel Make sure cable routing is neat and secure, and that the panel opens and closes easily, locks securely and doesn’t foul or chafe on the cables.
When connecting to the Control Door:
- The Ethernet Cable MUST NOT extend past the edge of the PCB.
- The Data Cable MUST have an allowance of slack in the cable on the PCB side.
- The earth cable MUST be orientated toward the hinge.
- Make sure the Speaker Wire is securely tucked away under the steelwork.
- Make sure none of the cable connections to the Control Door have become loose in handling.