Overview
If any of the GPOs inside the FUYL™ Locker bays fail and need to be replaced we have this guide to perform this action.
Procedure
- Power down the locker Unplug it and wait 30 seconds for any power to dissipate.
- Open the side panel
- Release the 5-way PDU Check it’s disconnected from the mains inlet, remove the secure sleeve, and undo the Velcro ties on its cable.
- Remove the 5-way PDU Undo its thumbscrews, then slide it to the left and remove it.
- Fit the replacement Reverse steps 3 and 4 to install the new 5-way PDU.
- Check and close the panel Make sure cable routing is neat and secure, and that the Maintenance Access Panel opens, closes and locks without catching the cables.