Overview
This describes the process of replacing the 24V Power Supply (PSU) in the FUYL Tower 5 & 15 Pro (MK3).
While relatively simple in the 5 Bay model, replacing the PSU in the 15 Pro is more of an involved process. Both should be undertaken with care and attention to recreating the default cable connections and routing. You may wish to take pictures while removing the original PSU to better document the replacement's positioning.
Warning!
Ensure the locker is completely powered down and disconnected before proceeding with the PSU replacement to avoid electrical hazards.
Requirements
- FUYL Tower 5 or 15 Pro (MK3)
- FUYL Admin keys (Shipped with Locker)
- FUYL Maintenance Screwdriver (Torx T20, shipped with Locker)
Procedure (5 Bay)
Get access
- Power down the locker Unplug it and wait 30 seconds for any stored power to dissipate.
- Open the side door Using the Admin keys shipped with the locker.
- Move the Power Distribution Board Remove the 3 thumb-screws holding the board (black box) in place, and pull it back and out. There’s no need to disconnect it, this just makes room.
Remove and replace the PSU
- Remove the IEC cable Remove the IEC C13 "Jug" cable from the power supply. You may need to hold the nearby ethernet cable out of the way.
- Unscrew the bracket Unscrew the PSU’s secure bracket with the supplied screwdriver (or another Torx T20 bit).
- Slide the bracket up To allow removal of the PSU.
- Remove the PSU With the bracket and IEC cable disconnected, rotate and pull the PSU outwards.
- Disconnect the splitter Trace the remaining cable from the PSU to the splitter at the top of the locker, and disconnect it.
- Install the new PSU Follow these steps in reverse order. Take care to fully insert both the IEC C13 cable and the splitter before bringing the locker online again.
Procedure (15 Bay)
Disconnect the PSU
- Power down the locker Unplug it and wait 30 seconds for any stored power to dissipate.
- Open the side door Using the Admin keys shipped with the locker.
- Disconnect the IEC cable Trace the IEC cable between the PSU and the power distribution board, and disconnect it. Remove any cable-ties and ferrite beads/chokes as you go, noting their locations.
- Disconnect the remaining cables Trace the remaining 3 cables from the PSU to each of the locks and the control door (you’ll need the Admin key to open it), note the routing, and remove each connector carefully. There are 17 connectors in total: one for each of the 15 bay lock modules, one for the control door, and one expansion/spare connector (the white connector in the photo in step 3).
Remove and replace the PSU
- Open bays 2 and 4 Once the PSU cabling is free, open them with their manual override levers.
- Remove the screws There are two screws near the back of each of bays 2 and 4. Remove them to free the PSU.
- Remove the PSU Gently tilt the PSU to help remove it, with its cabling, from the chassis.
- Install the new PSU Perform the same steps in reverse. The cable lengths are measured and shouldn’t be under tension when correctly positioned.